Planning & Development
This two single lane bridge is designed as a replacement structure for an old single lane steel pony truss bridge spanning the Magnatewan River on Ferguson Road. The project included modification to the existing abutments, ballast walls and wing walls. The new structure is designed as a pre-fabricated panel bridge, inclusive of a timber deck with a cantilevered sidewalk. Construction was completed in 2006.
0.2km North East of the Hamlet of Katrine
$600,000